The research is aimed at developing an integrated methodology based on digital tools to support professionals working on existing buildings using BIM – Building Information Modeling methodologies, combining digitization (As-Built) with the growing need for refurbishment in an integrated supply chain perspective. The focus is the XX century heritage in Emilia-Romagna, to respond to a need for widespread redevelopment of existing assets, fostering innovation in the use of advanced digital tools and innovative materials for the redevelopment process. One of the research objectives is to include all actors involved in the building renovation process in developing and managing the BIM model. The main challenge is the complexity of the process, which requires a planned, coordinated, and synchronised effort from all the involved actors. To foster an inclusive approach, the research methodology proposes simplified tools and procedures, designed to allow a gradual transition into the BIM methodology. The development of BIM Smart Packages, which combine the needs of all the actors involved in the refurbishment process and those who have to produce and trade integrated solutions, can increase stakeholders’ interest in investing in the digitisation of the intervention process.

BIM for existing heritage: from 3D integrated survey to parametric modeling for refurbishment and management

Tasselli, N.
Primo
Writing – Original Draft Preparation
;
Maietti, F.
Ultimo
Writing – Original Draft Preparation
2022

Abstract

The research is aimed at developing an integrated methodology based on digital tools to support professionals working on existing buildings using BIM – Building Information Modeling methodologies, combining digitization (As-Built) with the growing need for refurbishment in an integrated supply chain perspective. The focus is the XX century heritage in Emilia-Romagna, to respond to a need for widespread redevelopment of existing assets, fostering innovation in the use of advanced digital tools and innovative materials for the redevelopment process. One of the research objectives is to include all actors involved in the building renovation process in developing and managing the BIM model. The main challenge is the complexity of the process, which requires a planned, coordinated, and synchronised effort from all the involved actors. To foster an inclusive approach, the research methodology proposes simplified tools and procedures, designed to allow a gradual transition into the BIM methodology. The development of BIM Smart Packages, which combine the needs of all the actors involved in the refurbishment process and those who have to produce and trade integrated solutions, can increase stakeholders’ interest in investing in the digitisation of the intervention process.
2022
Existing Heritage, Digital Survey, Modelling, BIM, As-Built, Refurbishment
File in questo prodotto:
File Dimensione Formato  
isprs-archives-XLVI-2-W1-2022-481-2022_Maietti_Tasselli.pdf

accesso aperto

Descrizione: Paper 3D ARCH 2022
Tipologia: Full text (versione editoriale)
Licenza: Creative commons
Dimensione 1.48 MB
Formato Adobe PDF
1.48 MB Adobe PDF Visualizza/Apri

I documenti in SFERA sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11392/2479063
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 0
  • ???jsp.display-item.citation.isi??? 1
social impact