Production of Cs and Fr isotopes from uranium carbide targets of a high density has been investigated at IRIS (Investigation Radioactive Isotopes at Synchrocyclotron), Gatchina. The UC target material with a density of 12 g/cm3 was prepared in a form of pellets. Two targets were tested on-line under the same temperature conditions: (a) a reference small target with a thickness of 4.5 g/cm2; (b) a heavier (so called intermediate) target with a thickness of 91 g/cm2. Yields and release efficiencies of nuclides with half-lives from some minutes to some milliseconds produced by 1 GeV protons in these targets are presented. It is remarkable that yields, even those of very short-lived isotopes such as 214Fr (T1/2 = 5 ms) and 219Fr (T1/2 = 20 ms), increase proportionally to the target thickness. A one month off-line heating test of the 91 g/cm2 target at a temperature of 2000 °C has been carried out successfully. The yields and release efficiencies of Cs and Fr measured on-line before and after the heating test coincided within the limits of measurement errors, thereby demonstrating the conservation of the target unit parameters. Based on these very promising results, a heavier target with a mass about 0.7 kg is prepared presently at IRIS.
Studies of uranium carbide targets of a high density
TONEZZER, Michele;
2008
Abstract
Production of Cs and Fr isotopes from uranium carbide targets of a high density has been investigated at IRIS (Investigation Radioactive Isotopes at Synchrocyclotron), Gatchina. The UC target material with a density of 12 g/cm3 was prepared in a form of pellets. Two targets were tested on-line under the same temperature conditions: (a) a reference small target with a thickness of 4.5 g/cm2; (b) a heavier (so called intermediate) target with a thickness of 91 g/cm2. Yields and release efficiencies of nuclides with half-lives from some minutes to some milliseconds produced by 1 GeV protons in these targets are presented. It is remarkable that yields, even those of very short-lived isotopes such as 214Fr (T1/2 = 5 ms) and 219Fr (T1/2 = 20 ms), increase proportionally to the target thickness. A one month off-line heating test of the 91 g/cm2 target at a temperature of 2000 °C has been carried out successfully. The yields and release efficiencies of Cs and Fr measured on-line before and after the heating test coincided within the limits of measurement errors, thereby demonstrating the conservation of the target unit parameters. Based on these very promising results, a heavier target with a mass about 0.7 kg is prepared presently at IRIS.I documenti in SFERA sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.