The ALPI linear accelerator, as part of the SPES facility, should be upgraded. The main goal of the ALPI upgrade is increasing the ALPI energy to 10 MeV/A. In order to proceed the upgrade, two additional cryostats should be implemented in ALPI linac high-β section. In the framework of the ALPI Upgrade for the SPES facility production and cryostat measurements of the Nb/Cu, high-β QWR cavities was continued.

Production and Cryostat Measurements of the high-β Nb/Cu QWR cavities for the ALPI Upgrade of the SPES Facility

A. Tsymbaliuk
Primo
;
2021

Abstract

The ALPI linear accelerator, as part of the SPES facility, should be upgraded. The main goal of the ALPI upgrade is increasing the ALPI energy to 10 MeV/A. In order to proceed the upgrade, two additional cryostats should be implemented in ALPI linac high-β section. In the framework of the ALPI Upgrade for the SPES facility production and cryostat measurements of the Nb/Cu, high-β QWR cavities was continued.
2021
QWR, Superconductivity, Vertical test, ALPI Linac
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in SFERA sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11392/2533112
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact