Works for burying an important railway line are currently in progress in Ferrara, Italy. The required 800 mm-thick retaining walls were cast starting from July 2020 and completed on May 2021, involving about 70000 m3 of concrete. The conformi ty control of this concrete was carried out through 1414 compression tests on cubic specimens cured in water for 28 days at (20 +/-2) °C. A comparison with test results on specimens cured at ambient temperature and relative humidity shows significant differ ences with respect to standard curing conditions, and may provide useful information on the strength development in the structure. Finally, the strength distribution with depth is discussed based on tests on cores drilled from one of the retaining walls.

A Ferrara sono in corso i lavori per l’interramento di un’importante linea ferroviaria. I diaframmi previsti dal progetto, dello spessore di 800 mm, sono stati realizzati nel periodo Luglio 2020-Maggio 2021, per complessivi 70000 m3 di getto. Il controllo di accettazione del calcestruzzo è stato effettuato mediante l’esecuzione di 1414 prove di compressione su provini cubici maturati per 28 giorni in ac qua alla temperatura di (20r2) °C. Un confronto con prove condotte su campioni maturati in condizioni ambientali di temperatura ed umidità relativa evidenzia significative differenze rispetto alle condizioni standard e può fornire utili informazioni sullo sviluppo della resistenza in opera. Infine, sulla base di prove su carote prelevate da un diaframma, si esamina l’andamento della resistenza con la profondità.

Effetto delle condizioni di maturazione sulla resistenza a compressione del calcestruzzo impiegato in opere di interramento ferroviario

Minghini F
Primo
Conceptualization
;
Tullini N
Secondo
Funding Acquisition
;
2022

Abstract

Works for burying an important railway line are currently in progress in Ferrara, Italy. The required 800 mm-thick retaining walls were cast starting from July 2020 and completed on May 2021, involving about 70000 m3 of concrete. The conformi ty control of this concrete was carried out through 1414 compression tests on cubic specimens cured in water for 28 days at (20 +/-2) °C. A comparison with test results on specimens cured at ambient temperature and relative humidity shows significant differ ences with respect to standard curing conditions, and may provide useful information on the strength development in the structure. Finally, the strength distribution with depth is discussed based on tests on cores drilled from one of the retaining walls.
2022
978-88-99916-64-0
A Ferrara sono in corso i lavori per l’interramento di un’importante linea ferroviaria. I diaframmi previsti dal progetto, dello spessore di 800 mm, sono stati realizzati nel periodo Luglio 2020-Maggio 2021, per complessivi 70000 m3 di getto. Il controllo di accettazione del calcestruzzo è stato effettuato mediante l’esecuzione di 1414 prove di compressione su provini cubici maturati per 28 giorni in ac qua alla temperatura di (20r2) °C. Un confronto con prove condotte su campioni maturati in condizioni ambientali di temperatura ed umidità relativa evidenzia significative differenze rispetto alle condizioni standard e può fornire utili informazioni sullo sviluppo della resistenza in opera. Infine, sulla base di prove su carote prelevate da un diaframma, si esamina l’andamento della resistenza con la profondità.
conformity control; characteristic strength; curing
controllo di accettazione; resistenza caratteristica; condizioni di maturazione
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in SFERA sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11392/2497741
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact