We report on the progress of the PAX experimental programme since the last PAC meeting. During summer shutdown 2009 four new quadrupole magnets and a modified vacuum system have been installed into the COSY ring to form a section with low β functions. With the successful commissioning of this low-β insertion in January 2010 it has also been discovered that intra-beam scattering effects are likely limiting the beam lifetime. In order to get these effects under control and to improve the lifetime, to commission a new detection system, and to finally perform a first series of spin–filtering measurements with transverse polarisation, we request ten weeks of beam time. Contents
Status Report and Beam-Time Request for COSY experiment #199 Spin–Filtering Studies at COSY
BARION, Luca;BERTELLI, Susanna;CARASSITI, Vittore;CIULLO, Giuseppe;CONTALBRIGO, Marco;COTTA RAMUSINO, Angelo;FERRETTI, Paola;DRAGO, Alessandro;GUIDOBONI, Greta;LENISA, Paolo;PAPPALARDO, Luciano Libero;STANCARI, Giulio;STANCARI, Michelle Dawn;STATERA, Marco;
2010
Abstract
We report on the progress of the PAX experimental programme since the last PAC meeting. During summer shutdown 2009 four new quadrupole magnets and a modified vacuum system have been installed into the COSY ring to form a section with low β functions. With the successful commissioning of this low-β insertion in January 2010 it has also been discovered that intra-beam scattering effects are likely limiting the beam lifetime. In order to get these effects under control and to improve the lifetime, to commission a new detection system, and to finally perform a first series of spin–filtering measurements with transverse polarisation, we request ten weeks of beam time. ContentsI documenti in SFERA sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.