This work aims at integrating the understanding of the river geomorphic dynamic into planning of reservoir operation rules. The case study is a 112 km long reach of the Po river in Italy, from Piacenza to Boretto. The Isola Serafini (IS) gate serves a large run-of-the-river hydroelectricity plant since 1962. The dam blocks a relevant amount of sediments and is cause, together with intense sand mining, for the river bed incision immediately downstream that has made several navigation and irrigation devices unusable during low flow periods, leading to expensive and recurrent works to restore their functionality. The operational rule of IS gate was modelled using 4 parameters and a number of experiments were simulated adopting alternative operating policies over a 10-years period. A 1D hydraulic numerical model with mobile bed has been used to estimate bed degradation trends. The results show that there is space for a meaningful trade-off between the conflicting objectives of hydropower production and reduction of river bed degradation. The analysis provides operative rules able to effectively tackle river bed incision with moderate loss in hydropower production.

Integrating mobile bed numerical modelling into reservoir planning operations: the case study of the hydroelectric plant in Isola Serafini (Italy)

BERNARDI, Dario;PAVAN, Sara;SCHIPPA, Leonardo;
2013

Abstract

This work aims at integrating the understanding of the river geomorphic dynamic into planning of reservoir operation rules. The case study is a 112 km long reach of the Po river in Italy, from Piacenza to Boretto. The Isola Serafini (IS) gate serves a large run-of-the-river hydroelectricity plant since 1962. The dam blocks a relevant amount of sediments and is cause, together with intense sand mining, for the river bed incision immediately downstream that has made several navigation and irrigation devices unusable during low flow periods, leading to expensive and recurrent works to restore their functionality. The operational rule of IS gate was modelled using 4 parameters and a number of experiments were simulated adopting alternative operating policies over a 10-years period. A 1D hydraulic numerical model with mobile bed has been used to estimate bed degradation trends. The results show that there is space for a meaningful trade-off between the conflicting objectives of hydropower production and reduction of river bed degradation. The analysis provides operative rules able to effectively tackle river bed incision with moderate loss in hydropower production.
2013
9781845647421
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in SFERA sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11392/1852901
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 7
  • ???jsp.display-item.citation.isi??? ND
social impact